Follow Us On
Follow By Email
Blogtrottr

Friday, August 3, 2012

Back To Working On KITT

With the extreme temperatures we have had lately we have not worked on KITT as much as I would have liked. Tonight there was a major cool down following a brief storm and we were able to get back to work on KITT again.

I want to continue work on putting POR-15 on the firewall and the rest of the interior spots that we did not get to the first time. I started tonight by removing the brake and accelerator pedals.




I pushed the brake pedal wiring and the speedometer cable through the firewall and into the engine bay. 







I pulled the accelerator bracket, which is attached to the shift cable, back away from the firewall.


I pushed the grommet and the wiring for the heating and ventilation controls through the firewall and into the engine bay.





Next I removed the air inlet assembly.



Looking in from the engine bay to where the air inlet assembly was mounted.


I noticed before I removed the air inlet assembly that one of the tabs on the top was broke and bent over. I am not sure what purpose this serves, but I am sure it can be glued.



On to the wiring for the power antenna. I pushed the grommet wiring and antenna cable through the inner wall and into the fender.




No comments:

Post a Comment